No Great Northern or Thameslink trains on 25 or 26 December, and none after about 9pm on Christmas Eve. Every day to 4 January. Updated November 2026.

There are no trains from Welwyn Garden City, Hatfield or Welwyn North on Christmas Day or Boxing Day, Friday 25 and Saturday 26 December 2026. Great Northern and Thameslink both run fewer trains after about 5pm on Christmas Eve, and none after about 9pm. A reduced service runs from 21 December, and normal timetables return on Monday 4 January 2027.

Overview

  • Thursday 24 December: reduced service, fewer trains after about 5pm and none after about 9pm, earlier on some routes.
  • Friday 25 and Saturday 26 December: no Great Northern or Thameslink trains.
  • Sunday 27 December: normal Sunday service.
  • 28 to 31 December: reduced service. 1 January: significantly reduced service.
  • Monday 4 January 2027: normal service resumes.
  • Council car parks are free on 25 and 28 December and 1 January, except Kennelwood Lane in Hatfield.

Christmas trains from Welwyn Garden City, day by day

Both operators published their Christmas and New Year plans on 13 November 2026 (Great Northern, festive period, Thameslink, festive period). Christmas Day is a Friday, so the Boxing Day bank holiday moves to Monday 28 December (GOV.UK, bank holidays).

Great Northern and Thameslink Christmas and New Year service, 19 December 2026 to 4 January 2027
DateGreat NorthernThameslink
Sat 19 DecemberNormal Saturday service, some engineering changesNormal Saturday service, some engineering changes
Sun 20 DecemberNormal Sunday service, some engineering changesNormal Sunday service, some engineering changes
Mon 21 to Wed 23 DecemberReduced serviceReduced service
Thu 24 DecemberReduced service; fewer trains after about 5pm, none after about 9pmReduced service; fewer trains after about 5pm, none after about 9pm
Fri 25 DecemberNo trainsNo trains
Sat 26 DecemberNo trainsNo trains
Sun 27 DecemberNormal Sunday service, minor late-night engineering changesNormal Sunday service
Mon 28 to Thu 31 DecemberReduced serviceReduced service, some engineering changes
Fri 1 JanuarySignificantly reduced serviceSignificantly reduced service
Sat 2 and Sun 3 JanuaryNormal weekend service, some engineering changesNormal weekend service, some engineering changes
Mon 4 JanuaryNormal serviceNormal service

Neither operator has named a closure between Welwyn Garden City and London over Christmas. Thameslink’s big closure is south of London, around Redhill, from 20 December to 3 January, so through trains towards Gatwick and Brighton will be affected. Last train times for each day are on National Rail, and both operators say to check them before travelling on Christmas Eve.

Buses and parking

Arriva has run a Sunday timetable in Hertfordshire and Essex on every bank holiday so far in 2026 (Arriva, bank holidays). Its Christmas and New Year bus times are not out yet.

Council car parks charge Sunday rates on bank holidays, and only Kennelwood Lane in Hatfield charges on a Sunday. Every other council car park is free on 25 December, 28 December and 1 January (Welwyn Hatfield Borough Council). Resident permit schemes are not enforced on bank holidays, but double yellow lines, disabled bays and loading restrictions still are.

Last checked 16 November 2026.